Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
assumptionassumption
The framework’s industrial investment thesis assumes credible committed demand will generate sufficient volume to reduce initially higher no
The framework’s industrial investment thesis assumes credible committed demand will generate sufficient volume to reduce initially higher non-covered-country costs; no realised cost series is supplied.
claimallegation
The supplied framework is dated April 27, 2026. It expressly applies to Drone Dominance Program Phases Two through Four, limits eligible sys
The supplied framework is dated April 27, 2026. It expressly applies to Drone Dominance Program Phases Two through Four, limits eligible systems for orders, is not a statutory framework, and does not presently apply to all departmental small-UAS purchases.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
claimallegation
ExhibitA attributes foreign-entity prohibitions to FAR52.240-1/ASDA and describes Blue UAS accession for Phase1; it distinguishes the DFARS
ExhibitA attributes foreign-entity prohibitions to FAR52.240-1/ASDA and describes Blue UAS accession for Phase1; it distinguishes the DFARS magnet transition from the similarly numbered DDP phases. It reports January1,2027 full-chain magnet restrictions and links DDP Phase3 to that timing. These are the source’s legal descriptions, not a current legal verification.
Read the anchor · page 5
Exhibit A: Statutory and Regulatory Framework
The DDP supply chain requirements incorporate and in many cases accelerate the following statutory
and regulatory mandates:
1 FAR 52.240-1 / American Security Drone Act
FAR Subpart 40.2 and clause 52.240-1 (November 2024) prohibit operation and delivery of UAS
manufactured or assembled by American Security Drone Act-covered foreign entities, as listed by the
Federal Acquisition Security Council (FASC) on SAM.gov. As of December 22, 2025, operating such UAS in
contract performance is also prohibited. FY2020 NDAA Section 848 provides the basis for the Blue UAS
List. DDP Phase I requires full compliance with FAR 52.240-1 and Blue UAS List accession.
Note: The FASC-covered foreign entity list published on SAM.gov is currently derived from the
Consolidated Screening List and is broader than a drone-specific entity list. DFARS "covered country" (for
magnets/tantalum/tungsten restrictions under DFARS 252.225-7052) is defined as China, North Korea,
Russia, and Iran.
2 DFARS 252.225-7052: Magnets
Phase 1 (through 31 Dec 2026): NdFeB and SmCo magnets may not be melted or produced in a covered
country, but Chinese rare earth feedstock is permitted. Phase 2 (effective 1 Jan 2027): Prohibition
expands to the full mine-to-magnet supply chain, including mining, separation, refining, melting, and
production. The DDP aligns Phase 3 (Feb 2027) with DFARS Phase 2, and DDP Phase 2 (Aug 2026) signals
the preferred direction.
3 Battery Provisions
FY2024 NDAA Section 154 prohibits DoW battery procurement from six Chinese entities or their
subsidiaries by October 2027. FY2025 NDAA (Public Law 118-159), Section 883, requires DoD to
coordinate a battery strategy and report on sourcing, testing, and certification processes. FY2026 NDAA
Section 842 includes a provision to address batteries from foreign entities of concern in new defense
acquisitions. DDP policy targets for battery sourcing are more aggressive than current statutory
minimums: Phase II (Aug 2026) requires non-covered-country pack assembly and incentivizes non-
covered-country sourced cells. These DDP targets are program policy goals.
4 PCB Restrictions (10 U.S.C. 4873 / NDAA Sec 841)
Codified at 10 U.S.C. 4873, restrictions on sourcing defense PCBs and PCB assemblies from covered
countries (China, Russia, North Korea, Iran) have an effective date discussed in multiple sources as
January 1, 2027. DDP policy begins transition for mission-critical/trusted electronics PCBs at Phase II,
with broader US PCB sourcing preferred by Phase IV.
5 Semiconductor Restrictions (NDAA Sec 5949)
NDAA Section 5949 (FY2023) prohibits procurement of covered semiconductor products and services
from certain entities. A proposed FAR rule (Federal Register, February 2026) describes a statute-driven
effective date of December 23, 2027. DDP uses Phase III onward to initiate supplier inquiries and
readiness work for this prohibition, with the goal of full compliance by the statutory effective date.
Battery discussion distinguishes section154 entity restrictions, section883 strategy/reporting and section842 acquisition provisions. ExhibitB says the program’s August2026 pack-assembly target precedes statutory restrictions and expressly labels its percentages program policy rather than statutory mandates.
Read the anchor · page 5
Exhibit A: Statutory and Regulatory Framework
The DDP supply chain requirements incorporate and in many cases accelerate the following statutory
and regulatory mandates:
1 FAR 52.240-1 / American Security Drone Act
FAR Subpart 40.2 and clause 52.240-1 (November 2024) prohibit operation and delivery of UAS
manufactured or assembled by American Security Drone Act-covered foreign entities, as listed by the
Federal Acquisition Security Council (FASC) on SAM.gov. As of December 22, 2025, operating such UAS in
contract performance is also prohibited. FY2020 NDAA Section 848 provides the basis for the Blue UAS
List. DDP Phase I requires full compliance with FAR 52.240-1 and Blue UAS List accession.
Note: The FASC-covered foreign entity list published on SAM.gov is currently derived from the
Consolidated Screening List and is broader than a drone-specific entity list. DFARS "covered country" (for
magnets/tantalum/tungsten restrictions under DFARS 252.225-7052) is defined as China, North Korea,
Russia, and Iran.
2 DFARS 252.225-7052: Magnets
Phase 1 (through 31 Dec 2026): NdFeB and SmCo magnets may not be melted or produced in a covered
country, but Chinese rare earth feedstock is permitted. Phase 2 (effective 1 Jan 2027): Prohibition
expands to the full mine-to-magnet supply chain, including mining, separation, refining, melting, and
production. The DDP aligns Phase 3 (Feb 2027) with DFARS Phase 2, and DDP Phase 2 (Aug 2026) signals
the preferred direction.
3 Battery Provisions
FY2024 NDAA Section 154 prohibits DoW battery procurement from six Chinese entities or their
subsidiaries by October 2027. FY2025 NDAA (Public Law 118-159), Section 883, requires DoD to
coordinate a battery strategy and report on sourcing, testing, and certification processes. FY2026 NDAA
Section 842 includes a provision to address batteries from foreign entities of concern in new defense
acquisitions. DDP policy targets for battery sourcing are more aggressive than current statutory
minimums: Phase II (Aug 2026) requires non-covered-country pack assembly and incentivizes non-
covered-country sourced cells. These DDP targets are program policy goals.
4 PCB Restrictions (10 U.S.C. 4873 / NDAA Sec 841)
Codified at 10 U.S.C. 4873, restrictions on sourcing defense PCBs and PCB assemblies from covered
countries (China, Russia, North Korea, Iran) have an effective date discussed in multiple sources as
January 1, 2027. DDP policy begins transition for mission-critical/trusted electronics PCBs at Phase II,
with broader US PCB sourcing preferred by Phase IV.
5 Semiconductor Restrictions (NDAA Sec 5949)
NDAA Section 5949 (FY2023) prohibits procurement of covered semiconductor products and services
from certain entities. A proposed FAR rule (Federal Register, February 2026) describes a statute-driven
effective date of December 23, 2027. DDP uses Phase III onward to initiate supplier inquiries and
readiness work for this prohibition, with the goal of full compliance by the statutory effective date.
claimallegation
The PCB discussion cites10USC4873 and January2027 timing, with ExhibitA cautiously saying the date is discussed in multiple sources and Exhi
The PCB discussion cites10USC4873 and January2027 timing, with ExhibitA cautiously saying the date is discussed in multiple sources and ExhibitB stating it categorically. Semiconductor discussion describes a February2026 proposed FAR rule and December23,2027 statutory effective date; proposed rule status is expressly retained.
Read the anchor · page 5
Exhibit A: Statutory and Regulatory Framework
The DDP supply chain requirements incorporate and in many cases accelerate the following statutory
and regulatory mandates:
1 FAR 52.240-1 / American Security Drone Act
FAR Subpart 40.2 and clause 52.240-1 (November 2024) prohibit operation and delivery of UAS
manufactured or assembled by American Security Drone Act-covered foreign entities, as listed by the
Federal Acquisition Security Council (FASC) on SAM.gov. As of December 22, 2025, operating such UAS in
contract performance is also prohibited. FY2020 NDAA Section 848 provides the basis for the Blue UAS
List. DDP Phase I requires full compliance with FAR 52.240-1 and Blue UAS List accession.
Note: The FASC-covered foreign entity list published on SAM.gov is currently derived from the
Consolidated Screening List and is broader than a drone-specific entity list. DFARS "covered country" (for
magnets/tantalum/tungsten restrictions under DFARS 252.225-7052) is defined as China, North Korea,
Russia, and Iran.
2 DFARS 252.225-7052: Magnets
Phase 1 (through 31 Dec 2026): NdFeB and SmCo magnets may not be melted or produced in a covered
country, but Chinese rare earth feedstock is permitted. Phase 2 (effective 1 Jan 2027): Prohibition
expands to the full mine-to-magnet supply chain, including mining, separation, refining, melting, and
production. The DDP aligns Phase 3 (Feb 2027) with DFARS Phase 2, and DDP Phase 2 (Aug 2026) signals
the preferred direction.
3 Battery Provisions
FY2024 NDAA Section 154 prohibits DoW battery procurement from six Chinese entities or their
subsidiaries by October 2027. FY2025 NDAA (Public Law 118-159), Section 883, requires DoD to
coordinate a battery strategy and report on sourcing, testing, and certification processes. FY2026 NDAA
Section 842 includes a provision to address batteries from foreign entities of concern in new defense
acquisitions. DDP policy targets for battery sourcing are more aggressive than current statutory
minimums: Phase II (Aug 2026) requires non-covered-country pack assembly and incentivizes non-
covered-country sourced cells. These DDP targets are program policy goals.
4 PCB Restrictions (10 U.S.C. 4873 / NDAA Sec 841)
Codified at 10 U.S.C. 4873, restrictions on sourcing defense PCBs and PCB assemblies from covered
countries (China, Russia, North Korea, Iran) have an effective date discussed in multiple sources as
January 1, 2027. DDP policy begins transition for mission-critical/trusted electronics PCBs at Phase II,
with broader US PCB sourcing preferred by Phase IV.
5 Semiconductor Restrictions (NDAA Sec 5949)
NDAA Section 5949 (FY2023) prohibits procurement of covered semiconductor products and services
from certain entities. A proposed FAR rule (Federal Register, February 2026) describes a statute-driven
effective date of December 23, 2027. DDP uses Phase III onward to initiate supplier inquiries and
readiness work for this prohibition, with the goal of full compliance by the statutory effective date.
claimallegation
ExhibitA describes germanium export concentration and says future enacted procurement restrictions will be followed. It attributes a65% dome
ExhibitA describes germanium export concentration and says future enacted procurement restrictions will be followed. It attributes a65% domestic component cost test for2024–2028 to FAR25.101 rather than EO14307 and describes Berry/specialty-metals provisions. The document supplies no underlying legislation or regulation text for verification.
Read the anchor · page 6
6 Critical Minerals (Germanium)
China has imposed and adjusted export controls on germanium, creating supply uncertainty for allied
downstream processors. Over 60% of germanium refining is concentrated in China and Russia. The DDP
encourages non-Chinese sourcing for Germanium from Phase III onward. Where specific statutory
procurement restrictions on these minerals are enacted, DDP will align accordingly.
7 Executive Order 14307
EO 14307, "Unleashing American Drone Dominance" (signed June 6, 2025; Federal Register June 11,
2025), establishes whole-of-government policy for American UAS leadership and includes procurement-
related directives, including directing the FASC to publish a covered foreign entity list (per FY2024 NDAA
Section 1822) and directing DoW to expand and update the Blue UAS List (referencing FY2020 NDAA
Section 848). The DDP is aligned with EO 14307 objectives.
Note: The 65% domestic component cost threshold sometimes cited in connection with this EO is in fact
the Buy American domestic content test under FAR 25.101, which requires that domestic component
costs exceed 65% of total component cost for items delivered in calendar years 2024-2028. This is a FAR
requirement, not an EO 14307 requirement.
8 Berry Amendment / Specialty Metals
10 USC 4862 (Berry Amendment) and 10 USC 4872 (Specialty Metals) require domestic sourcing for
certain metals and materials in defense procurement. These apply to specialty steel, titanium, and other
metals used in sUAS structural components and fasteners.
claimallegation
ExhibitB’s germanium row already identifies FY2026 section844 and a December18,2027 effective date, but its note calls policy supply-risk-dr
ExhibitB’s germanium row already identifies FY2026 section844 and a December18,2027 effective date, but its note calls policy supply-risk-driven rather than a statutory mandate. This sits uneasily with ExhibitA’s conditional future-enactment wording and requires reconciliation rather than silent harmonisation.
Read the anchor · page 7
Exhibit B: Acceleration Beyond Statutory Requirements
The following table summarizes where DDP requirements accelerate beyond the statutory baseline. This
acceleration is deliberate: the DDP is designed to create demand certainty that incentivizes supply chain
investment, and waiting for statutory deadlines means losing the industrial window.
Component Area
Statutory / Regulatory Baseline
DDP Policy Target
Gap
Notes
procurement from 6 Chinese
FY2024 Sec 154, prohibits DoW
Batteries
companies by October 2027,
Sec 883 directs strategy
FY2025 NDAA Sec 883: requires
100% non-covered-country pack
statute
DDP ahead of
percentages. DDP targets are
development, not phased
Sec 842: new-start UAS battery
DoD battery strategy; FY2026 NDAA
assembly by Aug 2026 (Phase II)
mandates.
program policy, not statutory
restrictions (Jan 2028 per statute)
Motors
No explicit statutory motor prohibition
for sUAS
100% non-covered-country motor
Motor sourcing is entirely a DDP
assembly by Aug 2026 (Phase II)
DDP-only
statute mandates non-Chinese motors
program requirement. No current
for Group 1 sUAS.
DFARS 252.225-7052 Phase 2: Jan
Magnets (NdFeB)
2027 (full-chain covered-country
preferred by Feb 2027 (Phase III)
Full-chain non-covered-country
Aligned
CN, NK, RU, IR. DDP aligns to the
DFARS 7052 covered countries are
defense systems)
traceability for NdFeB in major
same timeline for sUAS magnets.
Defense PCBs
procurement of certain PCBs from
10 USC 4873 (Sec 841): prohibits
by Aug 2026 (Phase II)
Trusted non-covered-country PCBs
~5 months
per enacted law. DDP pulls this
Statutory effective date is Jan 2027
covered nations; effective Jan 2027
forward for critical flight-control PCBs.
Sec. 844 of the FY2026 NDAA
Germanium
germanium from non-allied nations
prohibits DoW procurement of
from Phase III (Feb 2027)
Non-covered-country fiber preferred
China has imposed export controls on
~10 months
germanium (2023-present). DDP
effective Dec 18, 2027
statutory mandate.
policy is driven by supply risk, not
Sec 5949: proposed FAR rule (Feb
Semiconductors
2026 Federal Register) describes
ICs preferred by Feb 2027 (Phase III)
Non-covered-country fab for critical
Effective date is per proposed rule,
statutory effective date of Dec 23,
~10 months
not yet final. DDP initiates compliance
2027
qualification cycles.
work early given long semiconductor
claimallegation
The battery narrative says Phase2 incentivises non-covered-country cells, whereas the Phase2 preferred table cell lists BMS components and r
The battery narrative says Phase2 incentivises non-covered-country cells, whereas the Phase2 preferred table cell lists BMS components and reserves explicit cell sourcing for Phase3 preferred. ExhibitB’s magnet row says full-chain non-covered-country preferred by Phase3, whereas the main Phase3 preferred row requires disclosed rare-earth feedstock origin and Phase4 preferred explicitly requires NCC feedstock. Narrative and table wording are not treated as interchangeable.
Read the anchor · page 4
COMPONENT AREA PHASE 2 MINIMUM
Aug 2026
PHASE 2 PREFERRED
Aug 2026
PHASE 3 MINIMUM
Feb 2027
PHASE 3 PREFERRED
Feb 2027
PHASE 4 MINIMUM
Aug 2027
PHASE 4 PREFERRED
Aug 2027
7. Motors
(incl. magnets, rare earth feedstock, stator,
bearings, housing)
NCC motor assembly; specialty metals
US/qualifying-country melted (10 USC
4863); ASDA-compliant entity
NCC motor assembly; DFARS-
compliant magnet sourcing plan
Same as Phase 2 Preferred
NCC motor assembly, magnet
production, and winding; disclosed rare
earth feedstock origin Same as Phase 3 Preferred
US/nearshored motor assembly and winding;
NCC magnet production; NCC rare earth
feedstock
8. Propellers, Airframe & Structural
Components
(incl. propellers, carbon fiber frame,
molded parts, fasteners, canopy, wiring
harness, connectors)
NCC assembly; specialty metals
US/qualifying-country melted (10 USC
4863/4872); ASDA-compliant entity
NCC assembly and fabrication;
NCC frame materials; NCC
connectors and wiring
Same as Phase 2 Preferred
NCC assembly and fabrication; NCC
frame materials; NCC connectors and
wiring; Berry Amendment compliant
fasteners Same as Phase 3 Preferred
US/nearshored assembly, fabrication, frame
materials, fasteners, connectors, and wiring
9. Batteries & BMS
(incl. cells, pack assembly, BMS
electronics, BMS PCB, passive
components, BMS firmware,
cathode/anode materials; excl. battery
chargers)
NCC pack assembly; not from Sec
1260H or FY24 NDAA Section 154 listed
entities (CATL); ASDA-compliant entity;
electronic parts from OCMs or
authorized distributors
NCC pack assembly; NCC BMS
assembly and PCB; BMS firmware
source code repo not hosted in or
administered from a covered
foreign country
Same as Phase 2 Preferred
NCC pack assembly; NCC cells
compliant with Section 842 of the FY26
NDAA; NCC BMS assembly, PCB, and
active components; BMS firmware
source code repo not hosted in or
administered from a covered foreign
country
Same as Phase 3 Preferred
US pack assembly; US manufactured cells,
BMS assembly and PCB; NCC passives; BMS
firmware source code repo hosted and
controlled by US entity and auditable upon
request
10. Imaging & Optics
(incl. EO cameras, IR/thermal sensors,
image sensors, ISP, optics/lenses, PCB,
passive components, camera firmware,
gimbal if equipped)
NCC PCBA; no Sec 889 components;
ASDA-compliant entity; electronic parts
from OCMs or authorized distributors
NCC camera/sensor assembly
and PCB; camera firmware
source code repo not hosted in or
administered from a covered
foreign country
Same as Phase 2 Preferred
NCC camera assembly, image sensor,
and PCB; camera firmware repo
hosted and controlled by US entity and
auditable upon request Same as Phase 3 Preferred
US camera assembly; US/nearshored image
sensor and PCB; NCC passives; camera
firmware repo hosted and controlled by US
entity and auditable upon request
11. Ground Control System
(incl. GCS hardware, GCS software, hand
controller, PCB, passive components, other
ground elements, encryption/COMSEC)
NCC assembly; no Sec 889 components;
electronic parts from OCMs or
authorized distributors
NCC assembly and PCB; software
source code repo not hosted in or
administered from a covered
foreign country Same as Phase 2 Preferred
NCC assembly and PCB; all GCS
software repos hosted and controlled
by US entity and auditable upon
request; encryption modules (if
applicable) from NCC source
Same as Phase 3 Preferred
US hardware assembly; US/nearshored PCB;
NCC passives; encryption modules (if
applicable) meeting or exceeding current DoD
standards; all GCS software source code repos
hosted and controlled by US entity and
auditable upon request
12. Fiber-Optic Tether
(if equipped; incl. optical fiber, spool
mechanism, germanium dopant)
ASDA-compliant entity for all elements
NCC spool mechanism
Same as Phase 2 Preferred
NCC fiber and spool
Same as Phase 3 Preferred
US/nearshored fiber and spool; NCC germanium
13. Payload / Lethality System
(incl. warhead, ESAD, fuzing
electronics, fuzing PCB, energetics,
fuzing/ESAD firmware, trainer
munition)
ESAD integrated; ASDA-compliant
entity; fuzing electronic parts from
OCMs or authorized distributors
NCC munition; NCC ESAD/EMSAD
meeting MIL-STD-1316
Same as Phase 2 Preferred
US munition; US ESAD/EMSAD
meeting MIL-STD-1316
Same as Phase 3 Preferred
US munition; US ESAD/EMSAD meeting MIL-
STD-1316; US-sourced energetic materials (if
applicable); US fuzing electronics with US
PCB; NCC passives
Bolded text highlights notable Phase 2 changes from Phase 1
claimallegation
This seven-page copy supplies a dated policy framework and statutory commentary, but no signed issuing instrument, source URL, adoption noti
This seven-page copy supplies a dated policy framework and statutory commentary, but no signed issuing instrument, source URL, adoption notice, supplier bill of materials, inspection, named-vendor eligibility finding, procurement award or delivery record. No Cyberlux or K8 compliance determination appears.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
claimallegation
The document describes a $1.1 billion advanced market commitment to procure over 200,000 Group 1 one-way attack small UAS across four phases
The document describes a $1.1 billion advanced market commitment to procure over 200,000 Group 1 one-way attack small UAS across four phases; procurement of millions annually is a strategic objective, not a recorded delivery or award.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
claimallegation
Its economic rationale accepts initially higher non-covered-country component costs and argues committed purchasing volume will create scale
Its economic rationale accepts initially higher non-covered-country component costs and argues committed purchasing volume will create scale economies. This is the framework’s causal investment thesis, not demonstrated cost or output results.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
claimallegation
Strategic context attributes supply concentration to China, including approximately 92% of NdFeB magnet manufacturing using DOE 2020 data, a
Strategic context attributes supply concentration to China, including approximately 92% of NdFeB magnet manufacturing using DOE 2020 data, approximately 50% of cells from three Chinese producers, approximately 60% of PCB output and 75%+ flight-controller assembly. These attributed estimates and the resulting supply-coercion risk rationale are not independently verified in this source.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
claimallegation
The compliance section describes a system similar to the Blue List managed by DCMA, vendor self-certification plus third-party assessment, c
The compliance section describes a system similar to the Blue List managed by DCMA, vendor self-certification plus third-party assessment, change analysis for previously evaluated systems, and a future non-exhaustive disallowed-component list. It anticipates changes posted before later phases; it contains no vendor-specific certification result.
Read the anchor · page 2
manipulation, and the ability to disrupt America's drone output at the precise moment when mass and speed matter
most.
The DDP supply chain schedule adopts a nuanced approach that distinguishes between components requiring
immediate trust (flight controllers, RF links, encryption, firmware, BMS) and those where a phased transition from allied
to domestic sourcing is technically and economically feasible. This is directly in line with President Trump and Secretary
Hegseth's direction to Unleash American Drone Dominance and consistent with the broader policy frameworks
established by the NDAA and DFARS.
4. Compliance
Compliance will generally be governed with a system similar to the current Blue List, managed by DCMA. Systems and
components from vendors invited to compete at each DDP phase will be self-certified and also evaluated by third-party
assessors. Systems that have been evaluated previously in the DDP will only be required to do change analysis. DCMA
will establish and publish a non-exhaustive list of components and subcomponents from covered countries that it has
determined do not meet the DDP standards in order to accelerate industry's adoption of compliant supply chain
elements.
This DDPSCF may evolve during execution. Any changes will be highlighted and posted on the Drone Dominance website
in advance of follow-on phases.
5. How to Read the Supply Chain Migration Table
The table on the following pages provides the complete, component-level supply chain requirements for each DDP
phase. Each row represents a component or subcomponent of a sUAS system. The columns are:
• Phase 1 Requirement (Feb 2026): The NDAA baseline.
• Phase 2 Minimum (Aug 2026): The floor for Phase II participation. Non-compliance is disqualifying.
• Phase 2 Preferred (Aug 2026): Attributes that will receive additional scoring weight. Signals the direction of
travel.
• Phase 3/4 Minimum and Preferred: Progressively tighter requirements. Minimum columns represent the
absolute standard for DDP purchases. Preferred columns signal what the DDP will reward and where the
program is heading, which is generally toward US sourcing.
Supply chains that exceed stated expectations will be given credit in scoring weight during each phase.
6. Definitions and Covered Countries
This schedule references multiple legal constructs that are not interchangeable. Industry should apply the correct
definition for each requirement:
American Security Drone Act (ASDA)-covered foreign entity: An entity included on the list maintained by the Federal
Acquisition Security Council (FASC) and published on SAM.gov. This list is currently derived from the Consolidated
Screening List and is broader than a drone-specific entity list. FAR 52.240-1 prohibits delivery and operation of UAS from
these entities.
DFARS covered country (DFARS 252.225-7052): For magnets, tantalum, and tungsten restrictions: China, North Korea,
Russia, and Iran. This is the DFARS-defined list and does not include Cuba or Venezuela.
Nearshored (program defined): Any countries in the Western Hemisphere that are not otherwise restricted by the
Department of Commerce.
claimallegation
Minimum requirements determine participation and non-compliance disqualifies; preferred requirements receive scoring weight. The table dates
Minimum requirements determine participation and non-compliance disqualifies; preferred requirements receive scoring weight. The table dates Phase 2 August 2026, Phase 3 February 2027 and Phase 4 August 2027, with each phase’s preferred column becoming the next phase’s minimum. Page2 describes a Phase1 baseline column, but the actual table starts at Phase2.
Read the anchor · page 2
manipulation, and the ability to disrupt America's drone output at the precise moment when mass and speed matter
most.
The DDP supply chain schedule adopts a nuanced approach that distinguishes between components requiring
immediate trust (flight controllers, RF links, encryption, firmware, BMS) and those where a phased transition from allied
to domestic sourcing is technically and economically feasible. This is directly in line with President Trump and Secretary
Hegseth's direction to Unleash American Drone Dominance and consistent with the broader policy frameworks
established by the NDAA and DFARS.
4. Compliance
Compliance will generally be governed with a system similar to the current Blue List, managed by DCMA. Systems and
components from vendors invited to compete at each DDP phase will be self-certified and also evaluated by third-party
assessors. Systems that have been evaluated previously in the DDP will only be required to do change analysis. DCMA
will establish and publish a non-exhaustive list of components and subcomponents from covered countries that it has
determined do not meet the DDP standards in order to accelerate industry's adoption of compliant supply chain
elements.
This DDPSCF may evolve during execution. Any changes will be highlighted and posted on the Drone Dominance website
in advance of follow-on phases.
5. How to Read the Supply Chain Migration Table
The table on the following pages provides the complete, component-level supply chain requirements for each DDP
phase. Each row represents a component or subcomponent of a sUAS system. The columns are:
• Phase 1 Requirement (Feb 2026): The NDAA baseline.
• Phase 2 Minimum (Aug 2026): The floor for Phase II participation. Non-compliance is disqualifying.
• Phase 2 Preferred (Aug 2026): Attributes that will receive additional scoring weight. Signals the direction of
travel.
• Phase 3/4 Minimum and Preferred: Progressively tighter requirements. Minimum columns represent the
absolute standard for DDP purchases. Preferred columns signal what the DDP will reward and where the
program is heading, which is generally toward US sourcing.
Supply chains that exceed stated expectations will be given credit in scoring weight during each phase.
6. Definitions and Covered Countries
This schedule references multiple legal constructs that are not interchangeable. Industry should apply the correct
definition for each requirement:
American Security Drone Act (ASDA)-covered foreign entity: An entity included on the list maintained by the Federal
Acquisition Security Council (FASC) and published on SAM.gov. This list is currently derived from the Consolidated
Screening List and is broader than a drone-specific entity list. FAR 52.240-1 prohibits delivery and operation of UAS from
these entities.
DFARS covered country (DFARS 252.225-7052): For magnets, tantalum, and tungsten restrictions: China, North Korea,
Russia, and Iran. This is the DFARS-defined list and does not include Cuba or Venezuela.
Nearshored (program defined): Any countries in the Western Hemisphere that are not otherwise restricted by the
Department of Commerce.
claimallegation
Definitions distinguish an ASDA-covered entity list on SAM.gov from DFARS covered countries China, North Korea, Russia and Iran, expressly e
Definitions distinguish an ASDA-covered entity list on SAM.gov from DFARS covered countries China, North Korea, Russia and Iran, expressly excluding Cuba and Venezuela from that DFARS definition. Nearshored is separately program-defined as unrestricted Western Hemisphere countries. These categories must not be collapsed.
Read the anchor · page 2
manipulation, and the ability to disrupt America's drone output at the precise moment when mass and speed matter
most.
The DDP supply chain schedule adopts a nuanced approach that distinguishes between components requiring
immediate trust (flight controllers, RF links, encryption, firmware, BMS) and those where a phased transition from allied
to domestic sourcing is technically and economically feasible. This is directly in line with President Trump and Secretary
Hegseth's direction to Unleash American Drone Dominance and consistent with the broader policy frameworks
established by the NDAA and DFARS.
4. Compliance
Compliance will generally be governed with a system similar to the current Blue List, managed by DCMA. Systems and
components from vendors invited to compete at each DDP phase will be self-certified and also evaluated by third-party
assessors. Systems that have been evaluated previously in the DDP will only be required to do change analysis. DCMA
will establish and publish a non-exhaustive list of components and subcomponents from covered countries that it has
determined do not meet the DDP standards in order to accelerate industry's adoption of compliant supply chain
elements.
This DDPSCF may evolve during execution. Any changes will be highlighted and posted on the Drone Dominance website
in advance of follow-on phases.
5. How to Read the Supply Chain Migration Table
The table on the following pages provides the complete, component-level supply chain requirements for each DDP
phase. Each row represents a component or subcomponent of a sUAS system. The columns are:
• Phase 1 Requirement (Feb 2026): The NDAA baseline.
• Phase 2 Minimum (Aug 2026): The floor for Phase II participation. Non-compliance is disqualifying.
• Phase 2 Preferred (Aug 2026): Attributes that will receive additional scoring weight. Signals the direction of
travel.
• Phase 3/4 Minimum and Preferred: Progressively tighter requirements. Minimum columns represent the
absolute standard for DDP purchases. Preferred columns signal what the DDP will reward and where the
program is heading, which is generally toward US sourcing.
Supply chains that exceed stated expectations will be given credit in scoring weight during each phase.
6. Definitions and Covered Countries
This schedule references multiple legal constructs that are not interchangeable. Industry should apply the correct
definition for each requirement:
American Security Drone Act (ASDA)-covered foreign entity: An entity included on the list maintained by the Federal
Acquisition Security Council (FASC) and published on SAM.gov. This list is currently derived from the Consolidated
Screening List and is broader than a drone-specific entity list. FAR 52.240-1 prohibits delivery and operation of UAS from
these entities.
DFARS covered country (DFARS 252.225-7052): For magnets, tantalum, and tungsten restrictions: China, North Korea,
Russia, and Iran. This is the DFARS-defined list and does not include Cuba or Venezuela.
Nearshored (program defined): Any countries in the Western Hemisphere that are not otherwise restricted by the
Department of Commerce.
claimallegation
The first six table rows cover flight controllers, communications/data links, GNSS, speed controllers, companion computers and other PCB ass
The first six table rows cover flight controllers, communications/data links, GNSS, speed controllers, companion computers and other PCB assemblies. They separate assembly, board/component sourcing and software repository control across minimum and preferred columns. The table is a sourcing schedule, not evidence that any named aircraft meets it.
Read the anchor · page 3
7. Supply Chain Migration Table
HOW TO READ THIS TABLE: Each row represents a consolidated component area. Phase 2 Minimum is the floor for DDP participation - non-compliance is disqualifying. Note that DDP targets are in excess of baseline NDAA compliance, which should be
assumed as a minimum for all columns below. Preferred columns (green) signal direction of travel and receive scoring weight. Each phase's preferred requirement becomes the next phase's minimum.
ACRONYMS: AI/ML - Artificial Intelligence / Machine Learning | ASDA - American Security Drone Act (FY2024 NDAA Sec 1821-1833) | BMS - Battery Management System | CATL-Contemporary Amperex Technology Co., Limited | COMSEC -
Communications Security | DDP - Drone Dominance Program | DFARS - Defense Federal Acquisition Regulation Supplement | DoD - Department of Defense | DoW - Department of War [EO - Electro-Optical | ESAD - Electronic Safe-and-Arm Device [
EMSAD - Electro-Mechanical Safe and Arm Device | ESC - Electronic Speed Controller | FC - Flight Controller | FW - Firmware | GCS - Ground Control System | GNSS - Global Navigation Satellite System | IC - Integrated Circuit | IMU - Inertial
Measurement Unit | IR - Infrared | ISP - Image Signal Processor | MCU - Microcontroller Unit | MIL-STD - Military Standard | MOSFET - Metal-Oxide-Semiconductor Field-Effect Transistor | NCC - Non-Covered Country (References DFARS definition) I
NDAA - National Defense Authorization Act | OCM - Original Component Manufacturer | OS- Operating System | PCB - Printed Circuit Board | PCBA - Printed Circuit Board Assembly | RF- Radio Frequency | SUAS - Small Unmanned Aerial System | US -
United States | USC - United States Code | VRX - Video Receiver | VTX - Video Transmitter
COMPONENT AREA
PHASE 2 MINIMUM
PHASE 2 PREFERRED
PHASE 3 MINIMUM
PHASE 3 PREFERRED
PHASE 4 MINIMUM
PHASE 4 PREFERRED
Aug 2026
Aug 2026
Feb 2027
Feb 2027
Aug 2027
Aug 2027
1. Flight Controller / Autopilot
NCC assembly; no Sec 889 components;
NCC assembly; NCC PCB;
NCC assembly; NCC PCB; firmware
US assembly; US/nearshored PCB; NCC
(incl. processor, IMU, sensors, FC
ASDA-compliant entity; electronic parts firmware source code repo not
repo hosted and controlled by US
passives; firmware source code repo hosted
PCB, passive components, autopilot
from OCMs or authorized distributors
hosted in or administered from a
Same as Phase 2 Preferred
entity and auditable upon request
Same as Phase 3 Preferred
and controlled by US entity and auditable upon
firmware)
covered foreign country
request
2. Communications & Data Link
NCC assembly; no Sec 889
NCC assembly; NCC PCB;
NCC assembly; NCC RF ICs and
US/nearshored assembly, RF semiconductors
(incl. telemetry radio, VTX/VRX, RF
components; ASDA-compliant;
firmware source code repo not
PCB; encryption module (if
and PCB; NCC passives; encryption and
transceiver ICs, antenna, PCB, passive
electronic parts from OCMs or
hosted in or administered from a
applicable) from NCC source;
comms firmware source code repos hosted and
components, encryption
authorized distributors
covered foreign country
Same as Phase 2 Preferred
encryption and comms firmware
Same as Phase 3 Preferred
controlled by US entity and auditable upon
module/COMSEC, comms firmware)
repos hosted and controlled by US
request
entity and auditable upon request
3. GNSS Module
NCC assembly; not from ASDA-covered
NCC assembly; NCC PCB;
NCC receiver module; NCC PCB;
US/nearshored receiver module; US/nearshored
(incl. receiver IC, PCB, passive components,
entity; no Sec 889 components;
firmware source code repo not
firmware repo hosted and controlled
PCB; NCC passives; firmware repo hosted and
GNSS firmware)
electronic parts from OCMs or
hosted in or administered from a
Same as Phase 2 Preferred
by US entity and auditable upon
Same as Phase 3 Preferred
controlled by US entity and auditable upon
authorized distributors
covered foreign country
request
request
4. Electronic Speed Controllers
NCC assembly; not from ASDA-
NCC assembly; NCC PCB;
NCC assembly; NCC PCB, MCU,
US assembly; US/nearshored power
(incl. power MOSFETs, MCU, gate
covered entity; electronic parts from
firmware source code repo not
and power semiconductors; firmware
semiconductors, MCU and PCB; NCC
drivers, ESC PCB, passive components,
OCMs or authorized distributors
hosted in or administered from a
Same as Phase 2 Preferred
repo hosted and controlled by US
Same as Phase 3 Preferred
passives; firmware repo hosted and controlled
ESC firmware)
covered foreign country
entity and auditable upon request
by US entity and auditable upon request
5. Companion Computer
NCC assembly; NCC processor; no Sec
NCC assembly; NCC processor
NCC assembly; NCC processor and
US assembly; US/nearshored processor and
(if equipped; incl. processor, AI/ML processor,
889 networking components;
and PCB; software source code
PCB; software repo hosted and
PCB; NCC passives; software source code repo
PCB, passive components, embedded
electronic parts from OCMs or
repo not hosted in or administered
Same as Phase 2 Preferred
controlled by US entity and auditable
Same as Phase 3 Preferred
hosted and controlled by US entity and
software/OS)
authorized distributors
from a covered foreign country
upon request
auditable upon request
6. PCBAs Other Than Listed
NCC assembly; Remote ID not
NCC PCB fabrication and
NCC PCB fabrication and
US/nearshored PCB fabrication and assembly for
(incl. carrier boards, Remote ID transmitters,
manufactured in covered foreign
assembly for all trusted electronics
assembly; firmware (if applicable)
all boards; NCC passives; firmware (if
power distribution boards, interface boards,
country; ASDA-compliant; electronic
boards; firmware (if applicable)
repo hosted and controlled by US
applicable) repo hosted and controlled by US
associated passive components, board
parts from OCMs or authorized
source code repo not hosted in or
Same as Phase 2 Preferred
entity and auditable upon request
Same as Phase 3 Preferred
entity and auditable upon request
firmware if applicable)
distributors
administered from a covered
foreign country
claimallegation
Rows7–13 cover motors, structural components, batteries/BMS, imaging, ground control, optional fibre tether and payload. They preserve diffe
Rows7–13 cover motors, structural components, batteries/BMS, imaging, ground control, optional fibre tether and payload. They preserve different assembly, fabrication, cell, material and repository-origin requirements and distinguish optional components. The actual battery Phase2 preferred column specifies BMS assembly/PCB and repository location, while NCC cells first appear explicitly in Phase3 preferred.
Read the anchor · page 4
COMPONENT AREA PHASE 2 MINIMUM
Aug 2026
PHASE 2 PREFERRED
Aug 2026
PHASE 3 MINIMUM
Feb 2027
PHASE 3 PREFERRED
Feb 2027
PHASE 4 MINIMUM
Aug 2027
PHASE 4 PREFERRED
Aug 2027
7. Motors
(incl. magnets, rare earth feedstock, stator,
bearings, housing)
NCC motor assembly; specialty metals
US/qualifying-country melted (10 USC
4863); ASDA-compliant entity
NCC motor assembly; DFARS-
compliant magnet sourcing plan
Same as Phase 2 Preferred
NCC motor assembly, magnet
production, and winding; disclosed rare
earth feedstock origin Same as Phase 3 Preferred
US/nearshored motor assembly and winding;
NCC magnet production; NCC rare earth
feedstock
8. Propellers, Airframe & Structural
Components
(incl. propellers, carbon fiber frame,
molded parts, fasteners, canopy, wiring
harness, connectors)
NCC assembly; specialty metals
US/qualifying-country melted (10 USC
4863/4872); ASDA-compliant entity
NCC assembly and fabrication;
NCC frame materials; NCC
connectors and wiring
Same as Phase 2 Preferred
NCC assembly and fabrication; NCC
frame materials; NCC connectors and
wiring; Berry Amendment compliant
fasteners Same as Phase 3 Preferred
US/nearshored assembly, fabrication, frame
materials, fasteners, connectors, and wiring
9. Batteries & BMS
(incl. cells, pack assembly, BMS
electronics, BMS PCB, passive
components, BMS firmware,
cathode/anode materials; excl. battery
chargers)
NCC pack assembly; not from Sec
1260H or FY24 NDAA Section 154 listed
entities (CATL); ASDA-compliant entity;
electronic parts from OCMs or
authorized distributors
NCC pack assembly; NCC BMS
assembly and PCB; BMS firmware
source code repo not hosted in or
administered from a covered
foreign country
Same as Phase 2 Preferred
NCC pack assembly; NCC cells
compliant with Section 842 of the FY26
NDAA; NCC BMS assembly, PCB, and
active components; BMS firmware
source code repo not hosted in or
administered from a covered foreign
country
Same as Phase 3 Preferred
US pack assembly; US manufactured cells,
BMS assembly and PCB; NCC passives; BMS
firmware source code repo hosted and
controlled by US entity and auditable upon
request
10. Imaging & Optics
(incl. EO cameras, IR/thermal sensors,
image sensors, ISP, optics/lenses, PCB,
passive components, camera firmware,
gimbal if equipped)
NCC PCBA; no Sec 889 components;
ASDA-compliant entity; electronic parts
from OCMs or authorized distributors
NCC camera/sensor assembly
and PCB; camera firmware
source code repo not hosted in or
administered from a covered
foreign country
Same as Phase 2 Preferred
NCC camera assembly, image sensor,
and PCB; camera firmware repo
hosted and controlled by US entity and
auditable upon request Same as Phase 3 Preferred
US camera assembly; US/nearshored image
sensor and PCB; NCC passives; camera
firmware repo hosted and controlled by US
entity and auditable upon request
11. Ground Control System
(incl. GCS hardware, GCS software, hand
controller, PCB, passive components, other
ground elements, encryption/COMSEC)
NCC assembly; no Sec 889 components;
electronic parts from OCMs or
authorized distributors
NCC assembly and PCB; software
source code repo not hosted in or
administered from a covered
foreign country Same as Phase 2 Preferred
NCC assembly and PCB; all GCS
software repos hosted and controlled
by US entity and auditable upon
request; encryption modules (if
applicable) from NCC source
Same as Phase 3 Preferred
US hardware assembly; US/nearshored PCB;
NCC passives; encryption modules (if
applicable) meeting or exceeding current DoD
standards; all GCS software source code repos
hosted and controlled by US entity and
auditable upon request
12. Fiber-Optic Tether
(if equipped; incl. optical fiber, spool
mechanism, germanium dopant)
ASDA-compliant entity for all elements
NCC spool mechanism
Same as Phase 2 Preferred
NCC fiber and spool
Same as Phase 3 Preferred
US/nearshored fiber and spool; NCC germanium
13. Payload / Lethality System
(incl. warhead, ESAD, fuzing
electronics, fuzing PCB, energetics,
fuzing/ESAD firmware, trainer
munition)
ESAD integrated; ASDA-compliant
entity; fuzing electronic parts from
OCMs or authorized distributors
NCC munition; NCC ESAD/EMSAD
meeting MIL-STD-1316
Same as Phase 2 Preferred
US munition; US ESAD/EMSAD
meeting MIL-STD-1316
Same as Phase 3 Preferred
US munition; US ESAD/EMSAD meeting MIL-
STD-1316; US-sourced energetic materials (if
applicable); US fuzing electronics with US
PCB; NCC passives
Bolded text highlights notable Phase 2 changes from Phase 1
eventattribution
Date printed on the supplied framework; not independently proved publication or effective date.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
inferenceinference
The source is useful as dated program-policy context; its own scope restriction prevents converting it into a universal procurement rule or
The source is useful as dated program-policy context; its own scope restriction prevents converting it into a universal procurement rule or retrospective finding about another program.
inferenceinference
Narrative summaries and component-table columns require separate citation because battery and magnet wording can produce different dates or
Narrative summaries and component-table columns require separate citation because battery and magnet wording can produce different dates or requirements if flattened into a single compliance label.
otherattribution
Complete supplied 7-page source reviewed at SHA-256 6c9ff856b299fedef8424b3c5f6d3e6d941c33e8ba06cdafa60727a90836a391. Source assertions, ori
Complete supplied 7-page source reviewed at SHA-256 6c9ff856b299fedef8424b3c5f6d3e6d941c33e8ba06cdafa60727a90836a391. Source assertions, original visual features, filing/communication context and identified missing attachments are retained. All seven pages read and all seven own page images inspected. OCR restores six pages with broken native font mapping; native page4 is readable after control-character removal. Tables retain page images as controlling layout, with exact-column differences captured in claims.
Read the anchor · page 1
Drone Dominance Program Supply Chain Framework (DDPSCF)
April 27, 2026
1. Introduction
The goal of this Framework (the DDPSCF) is to enable the Department of War (DoW) to purchase small unmanned aerial
systems (SUAS) without any components, subcomponents or raw materials sourced from covered countries - principally
China - at every tier of the supply chain and to promote the expansion of a domestic sUAS supply chain. We must have a
resilient and secure sUAS supply chain and industrial base so we are prepared to rapidly deliver sUAS at meaningful scale
in peacetime and during a conflict. Over the Drone Dominance Program's four phases, requirements progressively
tighten from baseline NDAA compliance (already utilized in Phase I) toward a long-term preference for systems sourced
and manufactured in the United States. This document provides industry with predictability on the direction and pace of
those requirements so companies can make informed investment decisions now.
This DDPSCF will apply to Phases Two through Four of the DDP and will limit those systems eligible for orders. The
DDPSCF is not a statutory framework, though it takes guidance from many statutory provisions, including some now in
force and some with future compliance dates. The DDPSCF does not apply to all sUAS purchases within the DOW at the
current time but industry could reasonably expect that the DoW will align around these standards over time in order to
consolidate demand signal and assist with the scaling of a resilient defense industrial base for sUAS.
This is not just a compliance exercise. China controls critical chokepoints across the sUAS supply chain and has already
begun restricting exports of UAS components. A contested supply chain is not a hypothetical risk - it is a present one.
The DDP uses the purchasing power of a $1.1 billion advanced market commitment to create the demand signal that
justifies private investment in domestic SUAS production capacity.
2. Purpose
This document establishes the phased supply chain requirements for the Drone Dominance Program (DDP), a $1.1 billion
advanced market commitment to procure over 200,000 Group 1 one-way attack (OWA) small unmanned aerial systems
(SUAS) across four phases. These systems are low-cost, and high-volume platforms, which affects both the feasibility and
urgency of supply chain migration for various components. The supply chain migration schedule herein defines the
minimum and preferred sourcing requirements for every major component of a sUAS system at each phase of the
program.
The strategic objective is to build a resilient, scalable, non-foreign-dependent supply chain for sUAS production that can
sustain procurement of millions of units annually by the United States and allied nations, even under conditions where
China or others restrict or block the sale of upstream components.
Components from non-covered countries will be more expensive, at least initially. But it is actual demand for compliant
components that will drive their costs down over time. Without real purchasing volume flowing through non-covered
country supply chains, those supply chains will never achieve the scale economics needed to compete. The higher cost
of non-covered country components is largely a function of low volume, and volume will only come from committed
procurement. This is fundamentally a chicken-and-egg problem - one that the DDP is designed to break by creating a
credible, multi-year demand signal.
3. Strategic Context
China controls critical chokepoints across the sUAS supply chain: rare earth separation and magnet production for
motors (~92% of NdFeB magnet manufacturing per DOE 2020 data), lithium-ion battery cell manufacturing (top 3 CN
producers make ~50% of global cells), PCB fabrication (~60% of global output), flight controller assembly (75%+ in CN),
and key semiconductor packaging. FPV-class motor and ESC markets are also dominated by Chinese components. This
concentration creates strategic supply chain risk primarily through supply coercion, production throttling, price
questionquestion
Which officially issued revision and component table controls where the battery, magnet and germanium narrative differs?
questionquestion
What authenticated award-specific requirements and vendor-specific sourcing evidence establish any particular aircraft’s eligibility?
distillateallegation
CONNECT
Reviewed relationships
The canvas follows the database: source to DISTIL record, DISTIL record to knowledge object, then reviewed relationship. Position alone means nothing.
The compliance section describes a system similar to the Blue List managed by DCMA, vendor self-certification plus third-party assessment, change analysis for previously evaluated systems, and a future non-exhaustive disallowed-component list. It anticipates changes posted before later phases; it contains no vendor-specific certification result.supportsDoes this framework prove a particular supplier or aircraft is compliant?
Specifically named source propositions support the bounded distinction or question.
The battery narrative says Phase2 incentivises non-covered-country cells, whereas the Phase2 preferred table cell lists BMS components and reserves explicit cell sourcing for Phase3 preferred. ExhibitB’s magnet row says full-chain non-covered-country preferred by Phase3, whereas the main Phase3 preferred row requires disclosed rare-earth feedstock origin and Phase4 preferred explicitly requires NCC feedstock. Narrative and table wording are not treated as interchangeable.supportsDoes this framework prove a particular supplier or aircraft is compliant?
Specifically named source propositions support the bounded distinction or question.
This seven-page copy supplies a dated policy framework and statutory commentary, but no signed issuing instrument, source URL, adoption notice, supplier bill of materials, inspection, named-vendor eligibility finding, procurement award or delivery record. No Cyberlux or K8 compliance determination appears.supportsThe source is useful as dated program-policy context; its own scope restriction prevents converting it into a universal procurement rule or retrospective finding about another program.
Specifically named source propositions support the bounded distinction or question.
Minimum requirements determine participation and non-compliance disqualifies; preferred requirements receive scoring weight. The table dates Phase 2 August 2026, Phase 3 February 2027 and Phase 4 August 2027, with each phase’s preferred column becoming the next phase’s minimum. Page2 describes a Phase1 baseline column, but the actual table starts at Phase2.supportsNarrative summaries and component-table columns require separate citation because battery and magnet wording can produce different dates or requirements if flattened into a single compliance label.
Specifically named source propositions support the bounded distinction or question.
The compliance section describes a system similar to the Blue List managed by DCMA, vendor self-certification plus third-party assessment, change analysis for previously evaluated systems, and a future non-exhaustive disallowed-component list. It anticipates changes posted before later phases; it contains no vendor-specific certification result.supportsWhat authenticated award-specific requirements and vendor-specific sourcing evidence establish any particular aircraft’s eligibility?
Specifically named source propositions support the bounded distinction or question.
This seven-page copy supplies a dated policy framework and statutory commentary, but no signed issuing instrument, source URL, adoption notice, supplier bill of materials, inspection, named-vendor eligibility finding, procurement award or delivery record. No Cyberlux or K8 compliance determination appears.supportsWhat authenticated award-specific requirements and vendor-specific sourcing evidence establish any particular aircraft’s eligibility?
Specifically named source propositions support the bounded distinction or question.
The battery narrative says Phase2 incentivises non-covered-country cells, whereas the Phase2 preferred table cell lists BMS components and reserves explicit cell sourcing for Phase3 preferred. ExhibitB’s magnet row says full-chain non-covered-country preferred by Phase3, whereas the main Phase3 preferred row requires disclosed rare-earth feedstock origin and Phase4 preferred explicitly requires NCC feedstock. Narrative and table wording are not treated as interchangeable.supportsWhich officially issued revision and component table controls where the battery, magnet and germanium narrative differs?
Specifically named source propositions support the bounded distinction or question.
The battery narrative says Phase2 incentivises non-covered-country cells, whereas the Phase2 preferred table cell lists BMS components and reserves explicit cell sourcing for Phase3 preferred. ExhibitB’s magnet row says full-chain non-covered-country preferred by Phase3, whereas the main Phase3 preferred row requires disclosed rare-earth feedstock origin and Phase4 preferred explicitly requires NCC feedstock. Narrative and table wording are not treated as interchangeable.supportsNarrative summaries and component-table columns require separate citation because battery and magnet wording can produce different dates or requirements if flattened into a single compliance label.
Specifically named source propositions support the bounded distinction or question.
The supplied framework is dated April 27, 2026. It expressly applies to Drone Dominance Program Phases Two through Four, limits eligible systems for orders, is not a statutory framework, and does not presently apply to all departmental small-UAS purchases.supportsWhat authenticated award-specific requirements and vendor-specific sourcing evidence establish any particular aircraft’s eligibility?
Specifically named source propositions support the bounded distinction or question.
Its economic rationale accepts initially higher non-covered-country component costs and argues committed purchasing volume will create scale economies. This is the framework’s causal investment thesis, not demonstrated cost or output results.supportsThe framework’s industrial investment thesis assumes credible committed demand will generate sufficient volume to reduce initially higher non-covered-country costs; no realised cost series is supplied.
Specifically named source propositions support the bounded distinction or question.
The supplied framework is dated April 27, 2026. It expressly applies to Drone Dominance Program Phases Two through Four, limits eligible systems for orders, is not a statutory framework, and does not presently apply to all departmental small-UAS purchases.supportsDoes this framework prove a particular supplier or aircraft is compliant?
Specifically named source propositions support the bounded distinction or question.
This seven-page copy supplies a dated policy framework and statutory commentary, but no signed issuing instrument, source URL, adoption notice, supplier bill of materials, inspection, named-vendor eligibility finding, procurement award or delivery record. No Cyberlux or K8 compliance determination appears.supportsDoes this framework prove a particular supplier or aircraft is compliant?
Specifically named source propositions support the bounded distinction or question.
The compliance section describes a system similar to the Blue List managed by DCMA, vendor self-certification plus third-party assessment, change analysis for previously evaluated systems, and a future non-exhaustive disallowed-component list. It anticipates changes posted before later phases; it contains no vendor-specific certification result.supportsThe source is useful as dated program-policy context; its own scope restriction prevents converting it into a universal procurement rule or retrospective finding about another program.
Specifically named source propositions support the bounded distinction or question.
The supplied framework is dated April 27, 2026. It expressly applies to Drone Dominance Program Phases Two through Four, limits eligible systems for orders, is not a statutory framework, and does not presently apply to all departmental small-UAS purchases.supportsThe source is useful as dated program-policy context; its own scope restriction prevents converting it into a universal procurement rule or retrospective finding about another program.
Specifically named source propositions support the bounded distinction or question.
This seven-page copy supplies a dated policy framework and statutory commentary, but no signed issuing instrument, source URL, adoption notice, supplier bill of materials, inspection, named-vendor eligibility finding, procurement award or delivery record. No Cyberlux or K8 compliance determination appears.supportsWhich officially issued revision and component table controls where the battery, magnet and germanium narrative differs?
Specifically named source propositions support the bounded distinction or question.
Rows7–13 cover motors, structural components, batteries/BMS, imaging, ground control, optional fibre tether and payload. They preserve different assembly, fabrication, cell, material and repository-origin requirements and distinguish optional components. The actual battery Phase2 preferred column specifies BMS assembly/PCB and repository location, while NCC cells first appear explicitly in Phase3 preferred.supportsNarrative summaries and component-table columns require separate citation because battery and magnet wording can produce different dates or requirements if flattened into a single compliance label.
Specifically named source propositions support the bounded distinction or question.
ExhibitB’s germanium row already identifies FY2026 section844 and a December18,2027 effective date, but its note calls policy supply-risk-driven rather than a statutory mandate. This sits uneasily with ExhibitA’s conditional future-enactment wording and requires reconciliation rather than silent harmonisation.supportsWhich officially issued revision and component table controls where the battery, magnet and germanium narrative differs?
Specifically named source propositions support the bounded distinction or question.
The document describes a $1.1 billion advanced market commitment to procure over 200,000 Group 1 one-way attack small UAS across four phases; procurement of millions annually is a strategic objective, not a recorded delivery or award.supportsThe framework’s industrial investment thesis assumes credible committed demand will generate sufficient volume to reduce initially higher non-covered-country costs; no realised cost series is supplied.
Specifically named source propositions support the bounded distinction or question.
WEIGH
Explained weighting